Get your software up to
date before the 1st Jan DEADLINE!
Order your 2012 upgrade now with important new Amendment 1 features.
17th Edition Amendment 1 changes
- New Electrical Installation Condition Report
- Additional 'flexible' cable types
- Revised rating factors
- Revised BS88 fuse data and Maximum Zs values
- New trough installation method
- New Minimum cable size
- Plus more...

Whats new with Amtech 2012...

|
 |
|
 |
|
 |
New Electrical Installation Condition Report
Major new report to replace periodic inspection report
|
|
Revised BS88 fuse data
Updated terminology to comply with latest regs
|
|
Maximum Zs values
Maximum Zs values adjusted for some fuses to meet new requirements
|
|

|
 |
 |
 |
 |
 |
New trough installation methods
New installation methods for cables enclosed in in-floor concrete troughs
|
|
Minimum cable size
Minimum cable size (1.5mm2) available for non-lighting copper power circuits
|
|
Additional 'flexible' cable types
Now very straightforward to provide details of correction factors for Class 5 flexible conductors
|
 |
|
|
Revised rating factors
Rating factors have been altered or added to meet the latest requirements
|
|
|
|

|
 |
|
> |
|
|
New trough installation methods
New installation methods for cable enclosed in in-floor concrete troughs
|
|
Additional 'flexible' cable types
Now very straightforward to provide details of correction factors for Class 5 flexible conductors
|
|

|
 |
|
|
New calculation functionality
Increased accuracy of calculations with reduced cumulative rounding effects
|
|
|
|

|
 |
|
|
Brand new certificate!
A new certificate has been introduced for the latest version of GasCert Plus: CP6 – Gas Service/Maintenance Checklist.
|
|
|
* If you sign up to pay for ongoing support by Direct Debit.